Carl, Seth, Jim and Rob have been going gangbusters this week. We were able to get all the lower cabinet bases in the peninsula anchored to the floor and level, which was no small thing. The HVAC duct comes up in the end cabinet, and that cabinet sits on the joint between the hardwood floor and the new kitchen floor, which gives it a little roll. Carl the expert got it fitting tight to the floor with no roll. On top of that the base is airtight to send the air out the duct, as planned. Carl is the man!




The Joes then showed up and hooked up the electrical, which meant the outlets now work, and the recessed lighting worked as well.

Rob took care of the drywall mudwork, twice! There were some tricky joints between old and new sections, but Rob got it looking great. While he was doing that, Carl, Seth, and Jim made the countertops for East Wall (the one with the sink/dishwasher/lazy susan) and the small cabinet between the stove and the fridge.

Today, Carl, Jim and Seth put the Fermica on that countertop, and laid the sink in place. Sam got home from work and hooked up the stove.



The spacesavor microwave oven came in today, and we will put it in shortly. We will keep you informed!